Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberELE05-00307
StatusFinaled
Name TONY GEDDES
Site Address 1804 S HILTON ST
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/6/20056/6/20056/6/2005PPASS
DetailsJack Frank
tony; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok
Final5/24/20055/25/20055/25/2005AFAIL
DetailsJack Frank
TONY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
cor met owner needs arc fualt for bedrms and correct wiring at gfci so they function properly
Conference4/4/20054/4/20054/4/2005PCANC
DetailsJack Frank
tony; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Conference4/4/20054/4/20054/4/2005PDONE
DetailsJack Frank
tony; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles cor. posted met owner, 110.2 dumbwaiter not listed, 250.148 grd metal boxes 4/4/2005 12:00:48 PM
Electrical Rough-In3/29/20053/29/20053/29/2005PFAIL
DetailsJack Frank
tony-- for the dumb waiter insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need to meet with owner 300.4 11/4, too many bends in flex, flex and cables not straped, need to check wire in dumb waiter shaft 3/29/2005 5:15:04 PM
Electrical Rough-In2/22/20052/22/20052/22/2005PPASS
DetailsWilliam E Thomas
tony or trisha; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ri ok 2/23/2005 7:00:24 AM
Conference2/15/20052/15/20052/15/2005APASS
DetailsJim Schmer
per your request
Electrical Rough-In2/15/20052/15/20052/15/2005APASS
DetailsJim Schmer
corrections made, ok for outer walls insulation and sheet rock upstairs only.
Electrical Rough-In2/9/20052/9/20052/9/2005PFAIL
DetailsJack Frank

or ###-####5 tony; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
partail cor. posted job not ready box fill staple cables at boxes nail plates 11/4 ", free length of conductor , no screws in plastic boxes grd metal boxes replace boxes with broken clamps, shall not split wire to fit under lug, complete all make up use #12 equip grd wire for 20 amp circuits not 14 have all wiring ready,, all walls built,, C O W 2/9/2005 3:45:22 PM