Final | 5/6/2005 | 5/6/2005 | 5/6/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/6/2005 at 7:18:46 AM. Contact: ###-####. ok to final 5/6/2005 8:31:17 AM
|
Rough-In Permanent Service | 2/10/2005 | 2/11/2005 | 2/11/2005 | A | PASS |
Bob Reichert
|
|
|
called contractor to staple one wire, and to put on a couple of nailplates. ric ok p/s u/g n ok 2/11/2005 10:05:28 AM
|
Rough-In Permanent Service | 2/10/2005 | 2/10/2005 | 2/10/2005 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/10/2005 at 7:46:55 AM. Contact: ###-####. 210.52(D) recpt to be 3' of sink in bathroom, 334.30 nm cable to be supported 4 1/2', 300.4(D) cable to be back 1 1/4" from edge, 300.4(A)(1) nailplates 2/10/2005 1:50:16 PM
|