Final | 5/5/2005 | 5/6/2005 | 5/6/2005 | A | PASS |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 5/5/2005 at 9:24:49 PM. Contact: ###-####. 5/6/2005 7:39:36 AM
|
Permanent Service | 3/25/2005 | 3/25/2005 | 3/25/2005 | P | PASS |
Mike Kinnear
|
|
|
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
p/s u/g n ok 3/25/2005 3:38:54 PM
|
Electrical Rough-In | 3/21/2005 | 3/22/2005 | 3/22/2005 | A | PASS |
Mike Kinnear
|
|
|
uffer ground insp --robin ###-#### -g. c. is robin & requested insp-jim schmer said was ok this time next time boise basin needs to call in ok cover with dirt ufer ground 3/22/2005 9:32:41 AM
|
Electrical Rough-In | 3/21/2005 | 3/21/2005 | 3/21/2005 | P | PASS |
William E Thomas
|
|
|
robin Note: ufer on left side of the house; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
ok to cover with concrete 3/21/2005 2:39:40 PM
|
Electrical Rough-In | 2/11/2005 | 2/14/2005 | 2/14/2005 | A | PASS |
Bob Reichert
|
|
|
Alan; Phone #: ###-#### Internet Inspection Request from: Jan Rice talked to contr. about adding recpt in big room on fireplace side of wall and to fix jacket on romex at switch. ric ok. 2/14/2005 9:48:51 AM
|