Electrical Rough-In | 9/28/2005 | 9/28/2005 | 9/28/2005 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/28/2005 at 10:12:42 AM. Contact: ###-####.
|
Electrical Rough-In | 9/27/2005 | 9/27/2005 | 9/27/2005 | P | NR |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 9/27/2005 at 10:13:03 AM. Contact: ###-####. had conf. about 6 in free conductor
|
Electrical Rough-In | 9/26/2005 | 9/26/2005 | 9/26/2005 | P | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/26/2005 at 8:52:28 AM. Contact: ###-####. 6 in free conductor protection of romex and load calculation not done yet.
|
Electrical Rough-In | 9/22/2005 | 9/22/2005 | 9/22/2005 | P | FAIL |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 9/22/2005 at 8:53:31 AM. Contact: ###-####. 1. 210.52- 2' 6' 12' rule in all the rooms 2. 300.14- 6'' of free conductor in most boxes 3. 334.30- securing and supporting of cables. 4. 300.4- 1 1/4" protection against physical damage. 5. 314.17- conductors shall be fastened within 8" of box.
|