Final | 3/4/2005 | 3/7/2005 | 3/7/2005 | A | PASS |
Bob Reichert
|
|
|
We 1)installed 2 new 120 volt circuits for counter receptacles 2)extended the existing emergency light circuit to a new emergency light 3) extended the existing roof-top receptacle circuit to a new GFCI receptacle near this tenant space's air conditioner 4)installed a new receptacle for the telephone system.Please meet us on-site at 8:30 AM for the tour.This is between the Moxie Java and the HobbyTown USA stores.Thanks!!!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok to final 3/7/2005 9:53:30 AM
|