Final | 5/9/2005 | 5/10/2005 | 5/10/2005 | A | NH |
Pat Lass
|
|
|
chad; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Final | 5/10/2005 | 5/10/2005 | 5/10/2005 | P | PASS |
Pat Lass
|
|
|
chad; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
no card 5/10/2005 1:21:53 PM
|
Final | 5/9/2005 | 5/9/2005 | 5/9/2005 | P | NH |
Pat Lass
|
|
|
chad; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreno access
called 5/9/2005 4:14:50 PM
|
Final | 5/5/2005 | 5/6/2005 | 5/6/2005 | A | FAIL |
Pat Lass
|
|
|
chad; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
open grounds 5/6/2005 11:45:26 AM
|
Conference | 4/26/2005 | 4/26/2005 | 4/26/2005 | A | PART |
Pat Lass
|
|
|
###-#### this is not one of my jobs- ; Phone #: ###-#### Internet Inspection Request from: dennis mcneely 4/26/2005 7:49:31 AM
called and told contractor to change this permit 4/26/2005 10:31:41 AM
|
Final | 4/21/2005 | 4/22/2005 | 4/22/2005 | A | FAIL |
Bob Reichert
|
|
|
please call 30 min prior to inspection///gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore called left message, left corr notice, 250.130(C) recpts shall use grounding means, 404.9 switches shall have faceplates installed 4/22/2005 10:30:46 AM
|
Electrical Rough-In | 3/8/2005 | 3/8/2005 | 3/8/2005 | P | PASS |
Pat Lass
|
|
|
Please call Gary 30 minutes prior to inspection for access. Thanks; Phone #: ###-#### Internet Inspection Request from: Gary Gettman
|
Electrical Rough-In | 3/8/2005 | 3/8/2005 | 3/8/2005 | P | PASS |
Pat Lass
|
|
|
###-#### gary or chad ###-####--re-insp
check required receps on final 3/8/2005 1:27:02 PM
|
Electrical Rough-In | 3/7/2005 | 3/7/2005 | 3/7/2005 | P | NH |
Pat Lass
|
|
|
###-#### - gary Note: please call 1/2 hr prior
called left message 3/7/2005 3:45:38 PM
|