Final | 5/10/2005 | 5/11/2005 | 5/11/2005 | A | PASS |
Bob Reichert
|
|
|
steve ###-#### ok to final, signed card
|
Final | 5/3/2005 | 5/4/2005 | 5/4/2005 | A | CANC |
Bob Reichert
|
|
|
Internet Inspection Request from: Tyler Bowen core and shell plans not done 5/4/2005 9:24:14 AM
|
Final | 4/29/2005 | 4/29/2005 | 4/29/2005 | P | PART |
Bob Reichert
|
|
|
STEVE FINAL; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy will finish with core and shell, need to sign occupancy card 4/29/2005 1:12:46 PM
|
Electrical Rough-In | 4/25/2005 | 4/25/2005 | 4/25/2005 | P | PASS |
Bob Reichert
|
|
|
CEILING COVER; Phone #: ###-#### Internet Inspection Request from: Tyler Bowen ok to cover ceiling 4/25/2005 3:55:23 PM
|
Electrical Rough-In | 3/23/2005 | 3/23/2005 | 3/23/2005 | P | PASS |
Bob Reichert
|
|
|
STEVE WALL COVER INSPECTION; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ok to cover walls only 3/23/2005 4:31:13 PM
|
Electrical Rough-In | 3/9/2005 | 3/9/2005 | 3/9/2005 | P | PASS |
Bob Reichert
|
|
|
STEVE UNDERGROUND INSPECTION; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy Called contr about pull box and depth of conduit under floor. He will not use pull box when setting panels. 3/9/2005 1:30:58 PM
|
Electrical Rough-In | 3/9/2005 | 3/9/2005 | 3/9/2005 | P | PASS |
Bob Reichert
|
|
|
ok to cover slab only. See same day comments about pullbox.
|