Final | 5/9/2005 | 5/9/2005 | 5/9/2005 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/9/2005 at 7:55:32 AM. Contact: ###-####. ok to final 5/9/2005 4:18:41 PM
|
Rough-In Permanent Service | 3/25/2005 | 3/28/2005 | 3/28/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/25/2005 at 12:02:08 PM. Contact: ###-####. corrections made, ric ok 3/28/2005 9:37:51 AM
|
Rough-In Permanent Service | 3/24/2005 | 3/25/2005 | 3/25/2005 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/24/2005 at 2:13:46 PM. Contact: ###-####. called contr, left message, still need nail plates up bath, up bedroom, stairs, living room, garage. re-inspection fee due. 300.4 (A)(1) and (D) 3/25/2005 8:49:39 AM
|
Rough-In Permanent Service | 3/23/2005 | 3/24/2005 | 3/24/2005 | A | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/23/2005 at 10:19:14 AM. Contact: ###-####.per mike kinnear cancel this one/3/23/05/mls & resend
|
Rough-In Permanent Service | 3/23/2005 | 3/23/2005 | 3/23/2005 | A | PART |
Mike Kinnear
|
|
|
per mike ok correction NEC300.4(A)(1)&(D) throughout house & garage NEC210.52(A)(2) upstairs bedroom
p/s u/g n ok 3/23/2005 11:46:05 AM
|
Rough-In Permanent Service | 3/22/2005 | 3/23/2005 | 3/23/2005 | P | FAIL |
Mike Kinnear
|
|
|
|
Rough-In Permanent Service | 3/17/2005 | 3/22/2005 | 3/22/2005 | A | NR |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/17/2005 at 3:51:46 PM. Contact: ###-####. called, left message, not ready 3/22/2005 9:12:37 AM
|
Rough-In Permanent Service | 3/17/2005 | 3/21/2005 | 3/17/2005 | A | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/17/2005 at 3:29:06 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 17 2005 3:50PM.
|