Electrical Rough-In | 3/28/2005 | 3/29/2005 | 3/29/2005 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/28/2005 at 10:59:10 AM. Contact: ###-####.
bonding ok 3/29/2005 1:10:22 PM
|
Electrical Rough-In | 3/14/2005 | 3/15/2005 | 3/15/2005 | | CANC |
Pat Lass
|
|
|
this is for pm 3/15/2005 8:09:27 AM
|
Electrical Rough-In | 3/14/2005 | 3/15/2005 | 3/15/2005 | P | PART |
Pat Lass
|
|
|
###-#### geri this is for bonding inspection please
u/g and partial grid ok
potting ok 3/15/2005 3:19:58 PM
|
Electrical Rough-In | 3/11/2005 | 3/14/2005 | 3/14/2005 | A | CANC |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/11/2005 at 2:18:04 PM. Contact: ###-####. cancel per Geri///3/14/05 8:57am BAS
|