Final | 8/23/2005 | 8/24/2005 | 8/24/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 8/23/2005 at 4:40:44 PM. Contact: ###-####. ok to final
|
Electrical Rough-In | 7/20/2005 | 7/21/2005 | 7/21/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/20/2005 at 10:34:08 PM. Contact: ###-####. corrections made, ric ok
|
Electrical Rough-In | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/15/2005 at 6:55:21 AM. Contact: ###-####. met owner, told about make-up and 1 1/4" for romex, bushings at panel. will fix and recall for ri
|
Conference | 6/27/2005 | 6/28/2005 | 6/28/2005 | A | DONE |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/27/2005 at 11:52:38 PM. Contact: ###-####. reviewed wiring ideas for new room
|