Final | 3/31/2005 | 3/31/2005 | 3/31/2005 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 3/31/2005 at 10:10:25 AM. Contact: ###-####.
|
Final | 3/28/2005 | 3/28/2005 | 3/28/2005 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/28/2005 at 7:27:57 AM. Contact: ###-####.
GFCI protect recepa
bathroom on its own circuit
directory 3/28/2005 9:31:33 AM
|
Electrical Rough-In | 3/21/2005 | 3/21/2005 | 3/21/2005 | A | PASS |
William E Thomas
|
|
|
ok to cover garage, and underground conduit
|
Rough-In Permanent Service | 3/21/2005 | 3/21/2005 | 3/21/2005 | A | CANC |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 3/21/2005 at 7:06:24 AM. Contact: ###-####.
wrong type insp 3/21/2005 9:28:04 AM
|
Electrical Rough-In | 3/14/2005 | 3/14/2005 | 3/14/2005 | P | PART |
Pat Lass
|
|
|
###-#### - don
west side of building 3/14/2005 3:54:06 PM
|