Final | 3/28/2005 | 3/28/2005 | 3/28/2005 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/28/2005 at 8:46:27 AM. Contact: ###-####.
P/S U/G N OK 3/28/2005 3:31:28 PM
|
Final | 3/18/2005 | 3/18/2005 | 3/18/2005 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/18/2005 at 9:11:43 AM. Contact: ###-####.
both have ungrounded metal comduit bodies.
upper one has fused neutral
this is 2 serviecs and should have 2 permits 3/18/2005 3:40:13 PM
|