Final | 5/6/2005 | 5/9/2005 | 5/9/2005 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/6/2005 at 12:41:43 PM. Contact: ###-####. corrections made, ok to final 5/9/2005 4:15:51 PM
|
Final | 5/5/2005 | 5/6/2005 | 5/6/2005 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/5/2005 at 4:26:42 PM. Contact: ###-####. called contr, left message, 404.9(A) switch faceplates shall seat against finished surface,110.26(A) work space shall be provided at a/c and hooked up 5/6/2005 12:25:35 PM
|
Rough-In Permanent Service | 3/25/2005 | 3/25/2005 | 3/25/2005 | P | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/25/2005 at 9:12:02 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 25 2005 9:32AM.
|
Electrical Rough-In | 3/15/2005 | 3/24/2005 | 3/24/2005 | A | PASS |
Bob Reichert
|
|
|
###-#### - steve called contr about 1 garage lite on south side of door too far set back, and check 1 1/4" in hall by kitchen. ric ok p/s u/g n ok 3/24/2005 10:12:28 AM
|