Final | 4/12/2005 | 4/12/2005 | 4/12/2005 | P | PASS |
Bob Reichert
|
|
|
Bob, we are ready for final inspection on this job. Thanks!!!! Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok to final, rest of equip now set 4/12/2005 3:10:07 PM
|
Final | 4/6/2005 | 4/6/2005 | 4/6/2005 | P | PART |
Bob Reichert
|
|
|
We are ready for you to re-inspect. My journeyman will be onsite if you can arrive right after Lunch.If you can't make it right after Lunch then please give us 20-30 minutes notice by phone so we can meet you onsite. Thanks!!!! Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell need to set one pump and scale before done. Rest ok. 4/6/2005 12:28:35 PM
|
Final | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | FAIL |
Bob Reichert
|
|
|
We would like this job inspected this afternoon, My journeyman will be onsite to give you the tour. Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell talked with elect, 110.26(A) work space shall be provided around panels. 4/1/2005 5:00:19 PM
|
Final | 3/29/2005 | 3/29/2005 | 3/29/2005 | P | PART |
Bob Reichert
|
|
|
Please inspect 2 short trenches near the silo at the far end of the trench that you had inspected for us last time, so we can cover.THANKS!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok to cover trench only to panels. 3/29/2005 4:29:10 PM
|
Electrical Rough-In | 3/17/2005 | 3/17/2005 | 3/17/2005 | P | PASS |
Pat Lass
|
|
|
trench inspection on the north side of building please///mitchell electric; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|