Final | 9/12/2005 | 9/13/2005 | 9/13/2005 | A | PASS |
Bob Reichert
|
|
|
johnnie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to final
|
Electrical Rough-In | 5/25/2005 | 5/26/2005 | 5/26/2005 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/25/2005 at 10:43:06 PM. Contact: ###-####.
|
Electrical Rough-In | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | NR |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 8:36:08 PM. Contact: ###-####. told owner to mount boxes for outside lites and recpts, and to make up all wiring. said he could temp insulation only due to temps required for floor. wiring in
|
Conference | 5/12/2005 | 5/13/2005 | 5/13/2005 | A | DONE |
William E Thomas
|
|
|
johnnie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles talked with home owner about the following- wall spacing, 1 1/4 protection, stapleing, box fill, gfci protection.
|