Final | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | PASS |
Pat Lass
|
|
|
rick//please call for access; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Electrical Rough-In | 4/14/2005 | 4/15/2005 | 4/15/2005 | A | PASS |
Pat Lass
|
|
|
###-#### upher ground inspection please///callahan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4/15/2005 7:41:13 AM
|
Electrical Rough-In | 4/13/2005 | 4/14/2005 | 4/14/2005 | A | PASS |
Pat Lass
|
|
|
upher ground inspection please///rick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok for concrete 4/14/2005 10:25:42 AM
|
Conference | 3/29/2005 | 3/29/2005 | 3/29/2005 | P | PART |
Pat Lass
|
|
|
chuck; Phone #: ###-#### Note: please call 1/2 hr prior to inspection Internet Inspection Request from: Cathy Chiles
R/I Ok 3/29/2005 12:58:52 PM
|
Electrical Rough-In | 3/22/2005 | 3/22/2005 | 3/22/2005 | P | FAIL |
Bob Reichert
|
|
|
###-#### Mark called contr, left corr notice. 250.32 concrete encased electrode shall be provided, 334.30 nm cable shall be stapled within 12" of panel 3/22/2005 1:23:11 PM
|