Final | 5/16/2005 | 5/17/2005 | 5/17/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/16/2005 at 3:31:57 PM. Contact: ###-####. ok to final
|
Electrical Rough-In | 4/29/2005 | 5/2/2005 | 5/2/2005 | A | PASS |
Bob Reichert
|
|
|
potting compound around pool///kevin; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa potting ok 5/2/2005 9:16:55 AM
|
Electrical Rough-In | 4/8/2005 | 4/11/2005 | 4/11/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 11:53:56 AM. Contact: ###-####. ok to cover u/g for pipng around pool 4/11/2005 8:34:20 AM
|
Electrical Rough-In | 3/29/2005 | 3/30/2005 | 3/30/2005 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/29/2005 at 4:56:10 PM. Contact: ###-####. main pool bond ok to cover,need to check equi-potential plane before done 3/30/2005 4:45:10 PM
|