Final | 4/18/2005 | 4/19/2005 | 4/19/2005 | A | PASS |
Bob Reichert
|
|
|
george; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to final. 4/19/2005 9:25:15 AM
|
Final | 4/15/2005 | 4/18/2005 | 4/18/2005 | P | NR |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/15/2005 at 4:27:02 PM. Contact: ###-####. when I got there, 4 electricians working on a/c, switches, ceiling boxes, panel, exit lites. I looked at ceiling for cover which is ok, but panel not made up so couldn't check recpts. They were going to pull part of ckt for pos recpts, I said they needed to do all or not in order to final. I said to call for another inspection, to final. 4/18/2005 3:41:32 PM
|
Electrical Rough-In | 4/6/2005 | 4/6/2005 | 4/6/2005 | P | PART |
Pat Lass
|
|
|
jeff//inspection for the north wall only please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
walls ok 4/6/2005 1:09:18 PM
|
Electrical Rough-In | 4/1/2005 | 4/4/2005 | 4/4/2005 | A | PASS |
Bob Reichert
|
|
|
call 1st before insp for access--mike -re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie corrections made, ric bathrooms only ok. common wall 1-sided since last inspection. looked at both sides and ok. 4/4/2005 10:49:20 AM
|
Electrical Rough-In | 3/31/2005 | 4/1/2005 | 4/1/2005 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/31/2005 at 3:46:20 PM. Contact: ###-####. called left message, corrections not made, re-inspection fee due . 300.4 cables parrallel to framing members, 300.10, elect cont. of metal raceways 4/1/2005 7:50:51 AM
|
Electrical Rough-In | 3/30/2005 | 3/31/2005 | 3/31/2005 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/30/2005 at 3:39:37 PM. Contact: ###-####.
Parallel protection
covering boxes
mc not supported 3/31/2005 11:29:03 AM
|