Final | 3/21/2008 | 3/21/2008 | 3/21/2008 | P | PASS |
Mike Kinnear
|
|
|
ok final service approved by 315
|
Permanent Service | 4/26/2005 | 4/26/2005 | 4/26/2005 | A | CANC |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 4/26/2005 at 6:36:06 AM. Contact: ###-####. called change to pm inspection
|
Permanent Service | 4/26/2005 | 4/26/2005 | 4/26/2005 | P | PASS |
Jack Frank
|
|
|
###-#### p/s u/g rec. ok 4/26/2005 1:42:21 PM
|
Permanent Service | 4/25/2005 | 4/25/2005 | 4/25/2005 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/25/2005 at 6:43:35 AM. Contact: ###-####. cor. posted called 250.92 shall bond metal raceway bottom of meterbase note there might be more water piping to bond dont know what will be done with old or new piping 4/25/2005 8:57:44 AM
|
Permanent Service | 4/19/2005 | 4/20/2005 | 4/20/2005 | A | PART |
Mike Kinnear
|
|
|
jim ###-#### service not ready had conf with electrical contractor -- clearance in front of panal & water pipe for grounding electrode
|