Final | 6/17/2005 | 6/20/2005 | 6/20/2005 | A | PASS |
Jack Frank
|
|
|
chuck ###-#### ok
|
Final | 6/14/2005 | 6/14/2005 | 6/14/2005 | P | NR |
Jack Frank
|
|
|
kelly; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa called not ready
|
Rough-In Permanent Service | 5/27/2005 | 5/31/2005 | 5/31/2005 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/27/2005 at 12:59:44 PM. Contact: ###-####. u/g and bond ok
|
Electrical Rough-In | 5/24/2005 | 5/25/2005 | 5/25/2005 | A | FAIL |
Jack Frank
|
|
|
underground for pool & potting--kelly ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie cor. posted called 680.10 needs 18" burial depth for u/g , 352.26 over 360 degrees of bends pvc
|
Electrical Rough-In | 4/25/2005 | 4/26/2005 | 4/26/2005 | A | PART |
Jack Frank
|
|
|
bonding insp --kf elec --###-#### ok 4/26/2005 10:32:43 AM
|