Final | 5/11/2005 | 5/11/2005 | 5/11/2005 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 5/11/2005 at 7:34:35 AM. Contact: ###-####. ok final
|
Electrical Rough-In | 5/4/2005 | 5/4/2005 | 5/4/2005 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/4/2005 at 8:31:37 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 4 2005 9:31AM.
|
Electrical Rough-In | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | PART |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 4/28/2005 at 2:46:47 PM. Contact: ###-####. conf regarding ceiling they are not done & there are other code violations t/w general & lea electric if they need correction for existing wiring. they need to get
|
Electrical Rough-In | 4/28/2005 | 4/28/2005 | 4/28/2005 | P | PART |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 4/28/2005 at 8:18:11 AM. Contact: ###-####.
ok to cover walls only 4/28/2005 6:49:29 PM
|