Final | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/19/2005 at 7:53:46 AM. Contact: ###-####. ok called alan he will bond roof metal to spa
|
Rough-In Permanent Service | 6/15/2005 | 6/16/2005 | 6/16/2005 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/15/2005 at 3:36:47 PM. Contact: (208) r/i ok p/s u/g new ok
|
Electrical Rough-In | 4/27/2005 | 4/28/2005 | 4/28/2005 | A | PART |
Jack Frank
|
|
|
ufer ground inspection ###-#### alan ok for concrete 4/28/2005 9:45:38 AM
|
Electrical Rough-In | 4/28/2005 | 4/28/2005 | 4/28/2005 | P | PASS |
Jack Frank
|
|
|
ufer ground inspection please///alan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for dirt 4/28/2005 2:43:45 PM
|