Final | 8/3/2005 | 8/4/2005 | 8/4/2005 | A | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 8/3/2005 at 4:49:34 PM. Contact: ###-####.
|
Electrical Rough-In | 5/5/2005 | 5/5/2005 | 5/5/2005 | A | PASS |
Bob Reichert
|
|
|
ok to pour gec, need to see after before backfill
|
Permanent Service | 5/4/2005 | 5/5/2005 | 5/5/2005 | A | CANC |
Bob Reichert
|
|
|
###-#### see added insp, for r/i u/g gec 5/5/2005 8:07:28 AM
|
Electrical Rough-In | 4/29/2005 | 5/2/2005 | 5/2/2005 | A | PASS |
Bob Reichert
|
|
|
verna; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa corrections made, ric ok, ok to cover gec, but need to see after poured,before backfill 5/2/2005 9:54:11 AM
|
Electrical Rough-In | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | FAIL |
Bob Reichert
|
|
|
###-#### Verna 4/29/2005 8:14:56 AM called contr, left message, left corr notice, 314.20 boxes shall be flush with surface on outside walls, 210.52(D) recpt shall be within 3' of basin upstairs bath, BCC job id shall be posted 4/29/2005 8:17:20 AM
|