DOC - Permit Finaled | | | 11/14/2005 | | DONE |
|
|
|
already fn
|
Permanent Service | 6/26/2005 | 6/27/2005 | 6/27/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/26/2005 at 3:45:50 PM. Contact: ###-####. corrections made, left correction notice to owner telling him to get permit to bring house up to date. correction notice didn't have a permit number on it. Called owner, left message. This permit should not be final . p/s u/g n ok
|
Rough-In Permanent Service | 6/24/2005 | 6/24/2005 | 6/24/2005 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/24/2005 at 8:29:07 AM. Contact: ###-####. called contr, left corr notice,250.32(b)(1)gnded cndr shall not be connected to gnd at sub-panel, 408.38 panels shall be dead-front, 110.26(2) width of work space shall be 30"
|
Conference | 6/21/2005 | 6/21/2005 | 6/21/2005 | P | DONE |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/21/2005 at 7:33:21 AM. Contact: ###-####. talked about getting p/s to work on house
|
Electrical Rough-In | 5/24/2005 | 5/24/2005 | 5/24/2005 | P | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/24/2005 at 7:57:35 AM. Contact: ###-####. they called and need to delay for a day
|