Final | 6/21/2005 | 6/22/2005 | 6/22/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/21/2005 at 3:25:08 PM. Contact: ###-####. called contractor, left survey, 404.9(A) faceplates shall seat against finished surface, signed occ card, ok to final
|
Electrical Rough-In | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 3:54:49 PM. Contact: ###-####. done under p/s
|
Rough-In Permanent Service | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 3:55:46 PM. Contact: ###-####. talked to elect, ok to cover ceiling, p/s, exst meter pak ,n, ok (city sticker on meter space)
|
Electrical Rough-In | 6/1/2005 | 6/1/2005 | 6/1/2005 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/1/2005 at 10:56:35 AM. Contact: ###-####. walls only ok to cover
|
Electrical Rough-In | 5/19/2005 | 5/19/2005 | 5/19/2005 | P | PASS |
Bob Reichert
|
|
|
underground insp --doug--###-#### ok to cover u/g
|
Electrical Rough-In | 5/19/2005 | 5/19/2005 | 5/19/2005 | P | PASS |
Bob Reichert
|
|
|
underground insp --doug--###-#### ok to pour u/g
|