Final | 11/19/2007 | 11/19/2007 | 11/19/2007 | P | PASS |
Jack Frank
|
|
|
ok
|
Permanent Service | 6/1/2005 | 6/2/2005 | 6/2/2005 | A | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 6/1/2005 at 4:20:22 PM. Contact: ###-####. p/s u/g n ok
|
Permanent Service | 6/1/2005 | 6/1/2005 | 6/1/2005 | P | NR |
Jack Frank
|
|
|
alan- ###-#### called needs to bond water system at p/s 250.104
|