Final | 8/1/2005 | 8/2/2005 | 8/2/2005 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/1/2005 at 4:10:40 PM. Contact: ###-####. ok
|
Electrical Rough-In | 7/26/2005 | 7/26/2005 | 7/26/2005 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/26/2005 at 8:40:03 AM. Contact: ###-####. u/g core hole for light fixtures ok
|
Electrical Rough-In | 7/18/2005 | 7/18/2005 | 7/18/2005 | P | PART |
Mike Kinnear
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok cover under ground conduit between fixtures at end of runway
|
Electrical Rough-In | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 1:28:18 PM. Contact: ###-####. u/g ok 2 conduits between to manholes
|
Electrical Rough-In | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/2/2005 at 1:19:03 PM. Contact: ###-####. u/g for center runway running N and S west end runway, and new vault
|