Final | 9/20/2005 | 9/21/2005 | 9/21/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/20/2005 at 7:05:47 PM. Contact: ###-####. ok to final
|
Electrical Rough-In | 6/22/2005 | 6/23/2005 | 6/23/2005 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/22/2005 at 6:50:23 PM. Contact: ###-####. corrections made, ric ok
|
Electrical Rough-In | 6/20/2005 | 6/21/2005 | 6/21/2005 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/20/2005 at 8:04:03 PM. Contact: ###-####. told builder, left corr notice,300.4(B)(2),(D) nm cable shall be 1 1/4" from edge of framing member, 334.30 nm cable shall be stapled within 8" of box, 314.17(A),110.12(A) openings in boxes shall be closed, 250.110, metal boxes shall be grounded,110.14(A) splices shall use identified devices
|