Final | 1/30/2006 | 1/30/2006 | 1/30/2006 | P | PASS |
Bob Reichert
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong talked to contr, ok to final at this time, further work will need a new permit
|
ELE-Aging Inspection | 1/23/2006 | 1/23/2006 | 1/27/2006 | | NR |
Pat Lass
|
|
|
called contractor suc
|
ELE-Aging Inspection | 11/21/2005 | 11/21/2005 | 11/21/2005 | | NR |
Pat Lass
|
|
|
John will check whats up by the end of the week suc
|
ELE-Aging Inspection | 9/19/2005 | 9/19/2005 | 9/20/2005 | | NR |
Pat Lass
|
|
|
suc
|
Electrical Rough-In | 6/23/2005 | 6/24/2005 | 6/24/2005 | A | CANC |
Bob Reichert
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore did 6-23-05
|
Electrical Rough-In | 6/23/2005 | 6/23/2005 | 6/23/2005 | P | PART |
Bob Reichert
|
|
|
u/g up to bldg ok to cover
|
Electrical Rough-In | 6/22/2005 | 6/22/2005 | 6/22/2005 | P | PART |
Bob Reichert
|
|
|
underground john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--early pm if ok to cover u/g cnd up to about 40' from bldg. need to see final length.
|
Electrical Rough-In | 6/10/2005 | 6/10/2005 | 6/10/2005 | P | PASS |
Bob Reichert
|
|
|
###-#### john met elect, they are ensuring 24" burial depth at boxes. ok to cover from island to south. We need to see from island to store at later time.
|