Final | 11/17/2005 | 11/18/2005 | 11/18/2005 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/17/2005 at 9:15:51 PM. Contact: ###-####.
|
Electrical Rough-In | 7/25/2005 | 7/26/2005 | 7/26/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/25/2005 at 11:59:01 AM. Contact: ###-####. corr made, ric ok
|
Electrical Rough-In | 7/24/2005 | 7/25/2005 | 7/25/2005 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/24/2005 at 11:52:34 PM. Contact: ###-####. BCC All make up shall be done,300.4 (A)(2) nail plates shall be used with notches, 300.4(D) nm cable shall be 1 1/4" from edge of framing member, 300.14 6" of free conductor shall be at each sw and recpt, 210.12(B) bedrooms branch ckts shall be protected by afci, 250.80 metal boxes shall be gnded, 314.19 boxes shall be closed, 314.20 boxes shall be mounted so front edge of box is not set back, nm shall be stapled within 8" of box and 4 1/2'. met owner, left corr notice
|