Final | 9/9/2005 | 9/12/2005 | 9/12/2005 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/9/2005 at 3:23:48 PM. Contact: ###-####. ok card signed
|
Electrical Rough-In | 8/24/2005 | 8/25/2005 | 8/25/2005 | A | PART |
Jack Frank
|
|
|
dan ###-#### grid ceilings ok
|
Permanent Service | 8/25/2005 | 8/25/2005 | 8/25/2005 | A | PASS |
Jack Frank
|
|
|
dan ###-#### p/s u/g new for meter ok
|
Electrical Rough-In | 8/15/2005 | 8/15/2005 | 8/15/2005 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/15/2005 at 7:53:52 AM. Contact: ###-####. walls and high ceiling ok north half of building,, told contractor to ge address and space numbers on building
|
Electrical Rough-In | 8/11/2005 | 8/12/2005 | 8/12/2005 | P | NH |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/11/2005 at 12:45:36 PM. Contact: ###-####. no access no address, called
|