Final | 1/11/2006 | 1/11/2006 | 1/11/2006 | P | PASS |
Pat Lass
|
|
|
Final Inspection for this afternoon. Thank you.; Phone #: ###-#### Internet Inspection Request from: Ryan Christensen
|
ELE-Aging Inspection | 1/9/2006 | 1/9/2006 | 1/9/2006 | | NR |
Pat Lass
|
|
|
suc
|
Electrical Rough-In | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | PART |
Pat Lass
|
|
|
This is for the LDS church remodel, per addressing this is the correct address.Call Rita if you have problems ###-#### Per Jim Schmer send it back out for inspection. 2nd floor ok
|
Electrical Rough-In | 10/25/2005 | 10/25/2005 | 10/25/2005 | P | CANC |
William E Thomas
|
|
|
please insp the second floor framed walls for cover Contact Ryan for questions; Phone #: ###-#### Internet Inspection Request from: Ryan Christensen no such address. called contractor and left message
|