Final | 9/30/2005 | 10/3/2005 | 10/3/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/30/2005 at 2:05:18 PM. Contact: ###-####. ok to final
|
Electrical Rough-In | 9/13/2005 | 9/14/2005 | 9/14/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/13/2005 at 2:29:37 PM. Contact: ###-####. checked all but panel schedules, ric ok, told low voltage people they need to use plates out of wall and protect wiring into furniture
|
Electrical Rough-In | 9/13/2005 | 9/13/2005 | 9/13/2005 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/13/2005 at 7:33:12 AM. Contact: ###-####. BCC inspection shall see make-up, be able to see in ceiling before cover. contr needs to move furniture and recall
|