Conference | 3/31/2006 | 3/31/2006 | 3/31/2006 | P | PASS |
Mike Kinnear
|
|
|
jerod; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok conf spacing on island kitchen
|
Electrical Rough-In | 10/4/2005 | 10/6/2005 | 10/6/2005 | A | PASS |
Mike Kinnear
|
|
|
Phone #: ###-#### Internet Inspection Request from: Lars Johnson ok cover ri
|
Rough-In Permanent Service | 10/3/2005 | 10/4/2005 | 10/4/2005 | A | PART |
Mike Kinnear
|
|
|
Mike, I told the low voltage contractor that he needed to clean up his work(stapling, nailplating, etc.) and it looked like he did as of 10/03. I also told him to take his wires out of my boxes where he didn't need them so it didn't affect my boxfill. It looked like he did that and just left the wire in the wall above my boxes for possible future cut-in use. I made all the changes that we talked about the other day. Any wires that are just hanging out are for for lighting inside cabinets, undercabinet lights, or lights that will be cut into the drywall at the time of trim. Thanks Mike, please call with any concerns.; Phone #: ###-#### Internet Inspection Request from: Lars Johnson hi voltage ok cover but need conf with low voltage contractor set up for am thursday p/s u/g n ok
|
Rough-In Permanent Service | 9/27/2005 | 9/28/2005 | 9/28/2005 | A | NR |
Mike Kinnear
|
|
|
Phone #: ###-#### Internet Inspection Request from: Lars Johnson conf with lars
|