Final | 10/4/2005 | 10/5/2005 | 10/5/2005 | A | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack
|
Electrical Rough-In | 9/27/2005 | 9/27/2005 | 9/27/2005 | A | PASS |
Pat Lass
|
|
|
POOL LIGHT POTTING COMPOUND; Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack
|
Electrical Rough-In | 9/21/2005 | 9/22/2005 | 9/22/2005 | P | PASS |
William E Thomas
|
|
|
EQUIPOTENTAL GRID; Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack grid ok for concrete
|
Electrical Rough-In | 9/21/2005 | 9/21/2005 | 9/22/2005 | P | FAIL |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 9/21/2005 at 9:26:35 AM. Contact: ###-####. rebar needs to be blocked off the ground so as to be in the concrete when poured
|
Electrical Rough-In | 9/8/2005 | 9/8/2005 | 9/8/2005 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/8/2005 at 9:21:52 AM. Contact: ###-####. U/G Ok
|
Electrical Rough-In | 8/29/2005 | 8/29/2005 | 8/29/2005 | P | PART |
Pat Lass
|
|
|
BONDING; Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack pool bonding ok no deck yet
|