Final | 12/2/2005 | 12/5/2005 | 12/5/2005 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/2/2005 at 4:29:49 PM. Contact: ###-####. finaled with survey for kitchen counter required recep.
|
Electrical Rough-In | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/1/2005 at 6:54:06 PM. Contact: ###-####. u/g ok
|
Rough-In Permanent Service | 9/1/2005 | 9/1/2005 | 9/1/2005 | P | PASS |
William E Thomas
|
|
|
allan ###-#### ri ok p/s o/h n ok
|