Final | 10/7/2005 | 10/10/2005 | 10/10/2005 | A | PASS |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok
|
Final | 10/7/2005 | 10/7/2005 | 10/7/2005 | P | FAIL |
William E Thomas
|
|
|
Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH 1. 210.8 recep in crawl space shall be gfci protected 2. 210.70 light switch for crawl space equipment shall be at entrance to crawl space 3. 406.4 laundry room recep shall be rigidly held in place
|
Final | 10/6/2005 | 10/7/2005 | 10/7/2005 | A | NH |
Jack Frank
|
|
|
need a final inspection the door is open. If there is any problem please call jean ###-####; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH notice posted called
|
Permanent Service | 9/23/2005 | 9/26/2005 | 9/26/2005 | A | PASS |
Jack Frank
|
|
|
Chris; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH p/s o/h rec. ok
|
Electrical Rough-In | 9/8/2005 | 9/8/2005 | 9/8/2005 | P | PASS |
Jack Frank
|
|
|
reinspect for rough in please call Chris Rambough if you have any questions ###-####; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok
|
Electrical Rough-In | 9/7/2005 | 9/8/2005 | 9/8/2005 | A | FAIL |
Jim Schmer
|
|
|
reinspect for rough in. thank you!; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH Bld insulated, corrections already posted, re-insp. fee due and another correction posted. jms
|
Electrical Rough-In | 9/7/2005 | 9/7/2005 | 9/7/2005 | P | FAIL |
Jack Frank
|
|
|
REINSPECT FOR ROUGH IN. THANK YOU ; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH cor.posted met contractor, 300.4(A)(1)&(D),250.64(E) connector for GEC, 210.63,210.8, 210.70(A)(3) switch, light, and recept in crawl spce for furnace equip, complete make up and what is hot wire hanging in laundry rm ceiling for
|
Conference | 9/6/2005 | 9/7/2005 | 9/7/2005 | A | DONE |
Jack Frank
|
|
|
conference with Mike, inspector, plese, at this location with electrician 8-8:30 AM please call Jeff @ ###-####; Phone #: ###-####ok
|
Electrical Rough-In | 9/6/2005 | 9/6/2005 | 9/6/2005 | P | NR |
Mike Kinnear
|
|
|
rough in reinspection. thank you; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH had conf with delbert keith & jack (315) regarding same problems with wiring as before that jack talked over with jeff
|
Electrical Rough-In | 9/2/2005 | 9/6/2005 | 9/6/2005 | A | NR |
Jack Frank
|
|
|
rough in inspect for fire damage repair.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH conference ok met contractor, needs furnace circuit, nail plates and 11/4", address kit circuits,and spacing of outlets, bond water piping
|