Final | 5/17/2006 | 5/17/2006 | 5/17/2006 | P | PASS |
Mike Kinnear
|
|
|
call 1/2 prior to insp -tom; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok final
|
Final | 5/12/2006 | 5/16/2006 | 5/16/2006 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/12/2006 at 3:33:11 PM. Contact: ###-####. talked to contractor and owner will do inspection 05-17-06 am
|
Final | 2/14/2006 | 2/15/2006 | 2/15/2006 | A | CANC |
Bob Reichert
|
|
|
Tom -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong called contr, he can't be there, wants to re-schedule
|
Electrical Rough-In | 9/14/2005 | 9/14/2005 | 9/14/2005 | P | PART |
Jack Frank
|
|
|
tom ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie still needs p/s calculation and inspection for wiring in attic space, also inspection for p/s
|
Electrical Rough-In | 9/12/2005 | 9/13/2005 | 9/13/2005 | A | FAIL |
Jack Frank
|
|
|
tom ###-#### need to talk with contractor left meesage 300.4 11/4", outlet spacing , p/s size, outlet in bath by toilet not on 20 amp, do not cover posted
|