Final | 11/9/2005 | 11/10/2005 | 11/10/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/9/2005 at 3:13:35 PM. Contact: ###-####. ok to final
|
Rough-In Permanent Service | 9/27/2005 | 9/29/2005 | 9/29/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/27/2005 at 1:07:02 PM. Contact: ###-####. called contr about gec abrasion protection, ric ok, p/s u/g n ok
|