Final | 3/5/2006 | 3/6/2006 | 3/6/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/5/2006 at 9:07:43 PM. ok card signed
|
Final | 2/3/2006 | 2/6/2006 | 2/6/2006 | A | FAIL |
Jack Frank
|
|
|
Tom; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong needs to install all fixtures
|
Rough-In Permanent Service | 11/17/2005 | 11/18/2005 | 11/18/2005 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/17/2005 at 9:17:11 PM. Contact: ###-####. makeup ok
|
Rough-In Permanent Service | 10/30/2005 | 10/31/2005 | 10/31/2005 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/30/2005 at 12:26:17 PM. Contact: ###-####. ok for cover needs to have make up done and call inspection
|
Rough-In Permanent Service | 10/26/2005 | 10/27/2005 | 10/27/2005 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/26/2005 at 6:47:42 PM. Contact: ###-####. met with owner had conference, 300.4, 314.16, box fill,staple romex, complete all makeup
|