Final | 3/17/2006 | 3/17/2006 | 3/17/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/17/2006 at 9:04:28 AM. Contact: ###-####. contractor made correction,surfsce extension from jbox entela testing field evaluation ok all equipment passed and labeled, card signed
|
Conference | 3/15/2006 | 3/15/2006 | 3/15/2006 | P | DONE |
Jack Frank
|
|
|
met with testing lab tech.
|
Final | 3/6/2006 | 3/7/2006 | 3/7/2006 | A | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/6/2006 at 11:54:17 AM. equipment needs listing, they are scheduled to have ETL evaluate it, xray xformer shall not be hooked up with flex met contractor
|
Electrical Rough-In | 1/25/2006 | 1/25/2006 | 1/25/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/25/2006 at 10:19:37 AM. Contact: ###-####. ceilings ok
|
Electrical Rough-In | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/22/2005 at 1:45:56 PM. Contact: ###-####. walls ok
|