Final | 12/13/2006 | 12/14/2006 | 12/14/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/13/2006 at 12:03:06 PM. Contact: ###-####. ok card signed
|
Electrical Rough-In | 11/30/2006 | 12/1/2006 | 12/1/2006 | A | PASS |
Jack Frank
|
|
|
cover corridor area D, call Sandi when arrive ###-####; Phone #: ###-#### Internet Inspection Request from: Tony Keen ok
|
Electrical Rough-In | 11/2/2006 | 11/6/2006 | 11/6/2006 | A | PART |
Jack Frank
|
|
|
Call Sandi when arrive ###-####; Phone #: ###-#### Internet Inspection Request from: Tony Keen D area walls and corridor grid ceiling
|
Final | 9/13/2006 | 9/14/2006 | 9/14/2006 | A | PART |
Jack Frank
|
|
|
###-#### temp occupancy ok card signed
|
Final | 9/11/2006 | 9/11/2006 | 9/13/2006 | P | PART |
Jack Frank
|
|
|
anop ok
|
Final | 9/8/2006 | 9/8/2006 | 9/11/2006 | P | PART |
Jack Frank
|
|
|
###-#### complete 2nd floor, and west rms 1st floor t/o ok
|
Final | 9/7/2006 | 9/7/2006 | 9/7/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/7/2006 at 8:40:19 AM. Contact: ###-####. 2nd floor rms offices pinwheels ok still need to inspect S E corner rms and offices 2nd floor
|
Electrical Rough-In | 9/7/2006 | 9/7/2006 | 9/7/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/7/2006 at 8:39:09 AM. Contact: ###-####.ceiling east side tie from old to new FMC
|
Electrical Rough-In | 9/1/2006 | 9/1/2006 | 9/1/2006 | A | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/1/2006 at 7:09:43 AM. Contact: ###-####. contr called
|
Electrical Rough-In | 8/18/2006 | 8/18/2006 | 8/18/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/18/2006 at 8:59:31 AM. Contact: ###-####. wood ceiling 2nd ok
|
Electrical Rough-In | 8/8/2006 | 8/9/2006 | 8/9/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/8/2006 at 3:06:04 PM. Contact: (208) u/g courtyard ok anop
|
Electrical Rough-In | 8/4/2006 | 8/7/2006 | 8/7/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/4/2006 at 10:53:13 AM. Contact: ###-####. 1st floor desk areas anop
|
Electrical Rough-In | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/1/2006 at 10:00:45 AM. Contact: ###-####. ok anop
|
Electrical Rough-In | 7/27/2006 | 7/28/2006 | 7/28/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/27/2006 at 8:06:50 AM. Contact: ###-####. u/g pole lights west end ok
|
Electrical Rough-In | 7/26/2006 | 7/26/2006 | 7/26/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/26/2006 at 5:45:28 AM. Contact: ###-####. ok anop
|
Electrical Rough-In | 7/20/2006 | 7/21/2006 | 7/21/2006 | P | PART |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 7/20/2006 at 12:50:01 PM. Contact: ###-####. ceiling
|
Electrical Rough-In | 7/19/2006 | 7/20/2006 | 7/20/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/19/2006 at 5:53:59 AM. Contact: ###-####. walls and ceilings only anop ok to cover, corridor 1st fl, ceiling 2nd fl
|
Electrical Rough-In | 7/10/2006 | 7/11/2006 | 7/11/2006 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 7/10/2006 at 11:16:13 AM. Contact: ###-####. ok cover ceiling only anop
|
Electrical Rough-In | 6/27/2006 | 6/27/2006 | 6/27/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/27/2006 at 7:51:22 AM. Contact: ###-####.front entry soffit lights ok needs too address over 4 90 degree bends anop
|
Electrical Rough-In | 5/23/2006 | 5/24/2006 | 5/24/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/23/2006 at 3:02:17 PM. Contact: ###-####. grds bonds for xformers, panel rooms
|
Electrical Rough-In | 4/18/2006 | 4/18/2006 | 4/18/2006 | P | PART |
Jack Frank
|
|
|
conference ok
|
Electrical Rough-In | 4/17/2006 | 4/18/2006 | 4/18/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/17/2006 at 1:33:50 PM. Contact: ###-####. r/i walls and inside soffits anop
|
Electrical Rough-In | 3/27/2006 | 3/28/2006 | 3/28/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/27/2006 at 1:17:27 PM. Contact: ###-####. r/i walls anop
|
Conference | 3/17/2006 | 3/17/2006 | 3/17/2006 | A | DONE |
Jack Frank
|
|
|
per jack for conf ok
|
Electrical Rough-In | 3/15/2006 | 3/16/2006 | 3/16/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/15/2006 at 9:17:28 AM. Contact: ###-####. walls as noted on prints Lea's shack
|
Electrical Rough-In | 3/8/2006 | 3/9/2006 | 3/9/2006 | P | PART |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 3/8/2006 at 1:24:01 PM. Contact: ###-####. ok cover walls only anop at lea office.
|
Electrical Rough-In | 3/6/2006 | 3/6/2006 | 3/6/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/6/2006 at 7:55:44 AM. Contact: ###-####. walls anop in lea's shack
|
Rough-In Permanent Service | 2/24/2006 | 2/28/2006 | 2/28/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/24/2006 at 2:33:08 PM. Contact: ###-####. u/g for p/s , generator, and grd grid
|
Electrical Rough-In | 2/16/2006 | 2/17/2006 | 2/17/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/16/2006 at 7:31:44 AM. Contact: ###-####. wall penthouse
|
Electrical Rough-In | 1/18/2006 | 1/18/2006 | 1/18/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/18/2006 at 10:02:15 AM. Contact: ###-####. anop north stairway lightning arrester wiring
|
Electrical Rough-In | 1/6/2006 | 1/9/2006 | 1/9/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/6/2006 at 2:01:17 PM. Contact: (208) lighting protection stair tower S W corner
|
Electrical Rough-In | 1/4/2006 | 1/5/2006 | 1/5/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/4/2006 at 3:18:27 PM. Contact: ###-####. partial walls penthouse ,and com rm
|