Final | 1/30/2006 | 1/30/2006 | 1/30/2006 | P | PASS |
Jack Frank
|
|
|
ready for final inspection. water heater conected and conduit exposed to shed. thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok called needs switch for shed
|
Final | 1/25/2006 | 1/25/2006 | 1/25/2006 | P | NR |
Mike Kinnear
|
|
|
WE ARE READY FOR A FINAL INSPECTION OF THE BATHROOM AND SERVICE COORRECTIONS; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH wiring to hot water heater not done, no inspection for wiring to & in back building. t/w doug keith
|
Rough-In Permanent Service | 1/9/2006 | 1/10/2006 | 1/10/2006 | A | PART |
Mike Kinnear
|
|
|
READY FOR ROUGH-IN INSPECTION OF NEW 200-AMP SERVICE ON THE S.E. CORNER OF THE DETACHED SHOP FOR IDAHO POWER TO CONNECT. ALSO READY FOR INSPECTION OF NEW PANEL AND BATHROOM INSIDE SHOP AREA. HOME OWNER WILL BE THERE TO ACCESS. PLEASE CALL MRS. KEITH AT ###-#### TO CONFIRM THEY ARE HOME ON YOUR WAY. THANK YOU. ; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH p/s o/h n ok note survey needs connector for ground wire & proper size romex connector for 10/3 romex in main service
|
Electrical Rough-In | 12/2/2005 | 12/2/2005 | 12/2/2005 | P | PASS |
Jack Frank
|
|
|
for carport cover- delbert ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|