Final | 12/13/2005 | 12/14/2005 | 12/14/2005 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/13/2005 at 3:27:32 PM.
|
Final | 12/12/2005 | 12/13/2005 | 12/13/2005 | A | NH |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 12/12/2005 at 11:35:42 AM. Contact: ###-####.
|
Electrical Rough-In | 11/17/2005 | 11/18/2005 | 11/18/2005 | A | PASS |
Pat Lass
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Electrical Rough-In | 11/16/2005 | 11/16/2005 | 11/16/2005 | P | PASS |
Pat Lass
|
|
|
###-#### dave or brian at ###-#### check box-fill in sunroom on final
|