Permit Information
Permit NumberELE05-04223
StatusExpired
Name A M E ELECTRIC
Site Address 805 E STATE ST
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Electrical Rough-In5/18/20065/19/20065/19/2006APASS
DetailsPat Lass
ground insp//marsha; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
electrode ok
Final5/15/20065/16/20065/16/2006ANR
DetailsPat Lass
marsha; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
this was for ok for concrete for electrode.
Electrical Rough-In11/22/200511/22/200511/22/2005PPASS
DetailsPat Lass
Scheduled by a contractor via Hello! on 11/22/2005 at 10:19:52 AM. Contact: ###-####.
R/I Ok with survey250.104 Bonding of Piping Systems and Exposed Structural Steel.
(A) Metal Water Piping. The metal water piping system shall be bonded as required in (1), (2), (3), or (4) of this section. Hot Water

Boise city requires concrete encased electrode for service grounding where new foundation is installed.

Concrete-Encased Electrode. An electrode encased by at least 50 mm (2 in.) of concrete, located within and near the bottom of a concrete foundation or footing that is in direct contact with the earth, consisting of at least 6.0 m (20 ft) of bare copper conductor not smaller than 4 AWG.
250.28 Main Bonding Jumper.
For a grounded system, an unspliced main bonding jumper shall be used to connect the equipment grounding conductor(s) and the service-disconnect enclosure to the grounded conductor of the system within the enclosure for each service disconnect.
300.4 Protection Against Physical Damage.
Where subject to physical damage, conductors shall be adequately protected.
314.43 Nonmetallic Boxes.
Provisions for supports or other mounting means for nonmetallic boxes shall be outside of the box.