Final | 3/15/2006 | 3/15/2006 | 3/15/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/15/2006 at 6:00:51 AM. Contact: ###-####. ok to final, called contr to change basement recpt to gfci
|
Final | 3/14/2006 | 3/14/2006 | 3/14/2006 | P | NR |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/14/2006 at 6:01:30 AM. Contact: ###-####. elect was held up, told to re-call
|
Rough-In Permanent Service | 11/29/2005 | 11/29/2005 | 11/29/2005 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 11/29/2005 at 7:58:34 AM. Contact: ###-####. ok cover ri p/s u/g n ok corrections made
|
Rough-In Permanent Service | 11/28/2005 | 11/28/2005 | 11/28/2005 | P | FAIL |
Bob Reichert
|
|
|
contact will be Rowdy; Phone #: ###-#### Internet Inspection Request from: Rowdy Monroe called contr, left corr notice, 312.5 abrasion protection shall be provided for conductors entering enclosures, 300.4(A) and (D) 1 1/4" shall be maintained for bored holes and nm cable from edge of framing member, BCC all make-up shall be done(box on floor in hall)
|