Temporary Service | 12/4/2005 | 12/5/2005 | 12/5/2005 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/4/2005 at 6:03:01 PM. Contact: ###-####. T/S O/H Ok
|
Temporary Service | 11/28/2005 | 11/29/2005 | 11/29/2005 | A | FAIL |
Pat Lass
|
|
|
rod ###-#### point of attachment too low. GEC to neurtal
|