Electrical Rough-In | 12/2/2005 | 12/2/2005 | 12/2/2005 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/2/2005 at 11:12:23 AM. Contact: ###-####. not ready called 300.4 11/4" 314.3 110.3(B) needs bond bushing or non metallic conn. at spa disconnect, also needs to update permit for spa and 1 rm
|
Electrical Rough-In | 11/28/2005 | 11/29/2005 | 11/29/2005 | A | FAIL |
Bob Reichert
|
|
|
rick ###-#### called contr, left message, left corr notice,314.20 outside box shall be flush with finished surface, 300.4(A)(1) edge of bored hole shall be 1 1/4" from face of framing member,BCC all make-up shall be done-220v on south wall, box shall be uncovered on south wall
|