Final | 4/5/2006 | 4/5/2006 | 4/5/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/5/2006 at 8:00:51 AM. Contact: ###-####. ok
|
Rough-In Permanent Service | 1/16/2006 | 1/17/2006 | 1/17/2006 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/16/2006 at 12:39:06 PM. Contact: ###-####. r/i ok p/s u/g new ok
|
Rough-In Permanent Service | 1/13/2006 | 1/13/2006 | 1/13/2006 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/13/2006 at 10:24:15 AM. Contact: ###-####. called contr, left corr notice,312.5 conductors entering enclosures shall have abrasion protection, 334.80 more than 2 nm cables bundled and passing thru wood framing using draft stopping shall adjust ampacity of each conductor (over panel), 300.4(A)&(D) edge of hole and nm cable shall be 11/4" from edge of framing members,BCC all make-up shall be done( #12 in wall between studs)
|
Electrical Rough-In | 11/29/2005 | 11/30/2005 | 11/30/2005 | A | PART |
Jack Frank
|
|
|
###-#### - jim Note: underground for post line ok
|