Rough-In Permanent Service | 11/30/2005 | 12/1/2005 | 12/1/2005 | A | PASS |
Jack Frank
|
|
|
erick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles p/s o/h rec. ok
|
Final | 12/1/2005 | 12/1/2005 | 12/1/2005 | A | PASS |
Jack Frank
|
|
|
erick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok
|
Rough-In Permanent Service | 11/30/2005 | 11/30/2005 | 11/30/2005 | P | FAIL |
Jack Frank
|
|
|
###-#### cor. met contractor, 300.10 needs bond bushing for RE washers, 310.15 derate wires in emt,250.104 bond hot and cold, 110.12 seal KOs, 358.42&314.15(A) use r/t fittings that are listed for wet location,312.5 needs conn for GEC at service, remove GEC from old panel (j box)
|
Final | 11/29/2005 | 11/30/2005 | 11/30/2005 | A | NH |
Jack Frank
|
|
|
###-#### - twin city no access called and this is a r/i/p/s not final contractor will reschedule and call me also needs to check grounding,is u/g water pipe
|